title: About Hiterra | Construction and project management, Tokyo
description: Formed in 2025, when two Japanese companies chose to build together for clients in Japan and abroad - Rebirth, building in Tottori since 1995, and Futaba Consultants.
url: https://hiterraepc.com/about/
language: en
---
![Exterior wall works, Hiroshima](https://hiterraepc.com/images/projects/hiroshima-exterior-wall-works/hiroshima-exterior-wall-works-02.webp)

# About Hiterra

Hiterra is a construction company formed in 2025, when two Japanese companies chose to build together, for clients in Japan and abroad. Rebirth has been building in Tottori since 1995 and has completed 122 projects in the last three years. Futaba Consultants, founded in Tokyo in 2015, manages rail, airport and water programmes for governments and funding agencies in more than thirty countries. Together they build factories, power plants, warehouses, hotels, public buildings and pavilions. At Expo 2025 Osaka, Hiterra worked on nine pavilions, eight of them national, and every one opened on the day. From Tokyo, Al Khobar and Singapore, Hiterra builds for the long term, because how it is built determines how long it lasts.

The two companies that formed Hiterra

[

![Rebirth Ltd.](https://hiterraepc.com/images/partners/rebirth.webp)

](http://www.rebirth-ltd.co.jp/)[

![Futaba Consultants Ltd.](https://hiterraepc.com/images/partners/futaba.webp)

](https://www.ftbc.co.jp/)

projects built in the last three years (Rebirth)
:   122

countries, through Futaba Consultants' programmes
:   30+

pavilions at Expo 2025 Osaka, 8 of them national
:   9

How it is built determines how long it lasts.™つくり方で、寿命は決まる。™

## Construction

Hiterra designs, calculates, fabricates and erects structures in its own workshops in Japan, with the roofing and cladding, and builds as the contractor. The record covers power generation, manufacturing, food production, cold chain, distribution, defence and public works.

## Project management

Hiterra manages projects on the owner's side: project management, site supervision, cost management and contract administration. Through Futaba Consultants, the group has managed rail, airport, water and process programmes for owners, ministries and funding agencies.

## Both on one project

The two services are separate. An owner can appoint Hiterra to build, or to manage the project while another company builds. On some projects Hiterra does both.

People →

## How Hiterra works

01

### Agreed before work starts

Before anyone goes to site, Hiterra agrees who does what at every join between trades and packages, and orders long-lead items early.

02

### Designed for what the building does

In a factory or a plant, the equipment sets the column grid and the tolerances, so the equipment layout comes first.

## How Hiterra got here

1. April 2025

   ### Nine pavilions opened at Expo 2025 Osaka

   Hiterra worked on nine pavilions, eight of them national, in four roles: construction, project management, structural steel and feasibility. Every one opened on 13 April 2025.
2. 2025

   ### Hiterra formed

   Rebirth and Futaba Consultants formed Hiterra to build and manage projects together.

## The record on this site

A selection of the group record, by year of completion.

116

218

219

320

221

722

123

424

925

126

PROJECTS PUBLISHED ON THIS SITE, BY YEAR OF COMPLETION

[The project record](https://hiterraepc.com/projects/)[History and partners](https://hiterraepc.com/partners/)[Company information](https://hiterraepc.com/about/company/)[Contact](https://hiterraepc.com/contact/)