---
title: Prequalification and documents | Hiterra
description: What Hiterra works to, how prequalification is handled, and the six capability documents, issued on request in the format your process requires.
url: https://hiterraepc.com/compliance/
language: en
---
![The underside of a timber structure, beams and braces joined with steel plates and bolts.](https://hiterraepc.com/images/editorial/craft/timber-soffit-steel-plates-sq.webp)

# Prequalification and documents

Hiterra works in several jurisdictions and holds the registrations each one requires. Documents are issued directly to the party that asks.

## What Hiterra works to

- ### Structural design

  Design and calculation to the Japanese Building Standard Act, including seismic design. Steel fabricated in Hiterra's own workshops to Japanese standards.
- ### Fire and material certification

  Where a specified material has no certificate, Hiterra takes it through national fire testing as part of the programme. On one pavilion this took three months from raw material to installed surface.
- ### Other jurisdictions

  Designs from abroad are carried into Japanese code, and Japanese engineering into other markets. Each country's approval sequence is planned into the programme.
- ### HSE and QA

  HSE plans, method statements and risk assessments issued before mobilisation and aligned to the client’s and the authority’s requirements.
- ### Local employment

  Where a market sets national employment requirements, Hiterra plans for them from the start.
- ## Prequalification

  Hiterra holds the registrations, licences and insurance each of its markets requires, and issues them to the party that asks. Classification documents for Saudi Arabia are issued on request.

  Send the forms your process requires, and Hiterra will complete them. They usually cover company registrations, trade licences, insurance certificates, financial standing, HSE record, organisation charts and project references.

  Hiterra responds to prequalification requests within a working week, sooner where a tender deadline requires it.

  [Request prequalification documents](https://hiterraepc.com/contact/)

## Documents

Issued on request, in the format your process requires.

- ### Company profile

  20 pages

  Factories, power plants, warehouses, hotels, public buildings and pavilions. Built and managed, in Japan and abroad.
- ### Construction delivery

  28 pages

  Factories, power plants, hotels, public buildings and pavilions, made to last.
- ### Engineering, cost and project management

  25 pages

  On the owner's side of the contract.
- ### Expo pavilions

  19 pages

  Nine pavilions at Expo 2025 Osaka, eight of them national. Construction, fit-out, handover and dismantling.
- ### Hotel fit-out

  26 pages

  Interior fit-out, architectural joinery, specialist finishes and FF&E.
- ### Interiors and hospitality

  40 pages

  Fit-out, specialist finishes, facade and cladding. The technical and procurement decisions behind each one.

[Register as a supplier](https://hiterraepc.com/suppliers/)[Request documents](https://hiterraepc.com/contact/)
