---
title: Hiterra - construction and project management | Tokyo, Japan
description: Factories, power plants, hotels, public buildings and pavilions, built and managed in Japan and abroad. Made to last.
url: https://hiterraepc.com/
language: en
---
![Portugal Pavilion, Expo 2025 Osaka](https://hiterraepc.com/images/projects/2025-portugal-pavillon/2025-portugal-pavillon-06.webp)

TOKYO AL KHOBAR SINGAPORE

# How it is built determines how long it lasts.™ つくり方で、寿命は決まる。™

From the first idea to the day the doors open, we stay beside our clients, turning their plans into buildings that last for generations.

[See the projects](https://hiterraepc.com/projects/)

Formed in 2025 by two Japanese companies, Rebirth and Futaba Consultants.

[About Hiterra→](https://hiterraepc.com/about/)

|  |  |
| --- | --- |
| projects as a group | 130+ |
| Expo 2025 pavilions, 8 of them national | 9 |
| offices | 3 |

## Selected projects

[All projects→](https://hiterraepc.com/projects/)

- [

  ![Portugal Pavilion rope envelope seen from below](https://hiterraepc.com/images/projects/2025-portugal-pavillon/2025-portugal-pavillon-11.webp)

  Portugal PavilionOsaka, Japan, 20259,972 rope elements→](https://hiterraepc.com/projects/portugal-pavilion-expo-2025/)
- [

  ![Saihaku factory, Tottori](https://hiterraepc.com/images/projects/2016-jp-tottori-saihaku-factory-peb-8684m2/2016-jp-tottori-saihaku-factory-peb-8684m2-02.webp)

  Saihaku FactoryTottori, Japan, 20258,684 square metres→](https://hiterraepc.com/projects/saihaku-factory-tottori/)
- [

  ![Daisen Lake Hotel, Tottori](https://hiterraepc.com/images/projects/daisen-lake-hotel/daisen-lake-hotel-04.webp)

  Daisen Lake HotelTottori, Japan, 2024Lakeside hotel and fit-out→](https://hiterraepc.com/projects/daisen-lake-hotel/)
- [

  ![Ishikari biomass power plant, Hokkaido](https://hiterraepc.com/images/projects/2025-ishikari-region-biomass/2025-ishikari-region-biomass-02.webp)

  Ishikari Biomass Power PlantHokkaido, Japan, 2025Structure for a biomass power plant→](https://hiterraepc.com/projects/ishikari-biomass-power-plant/)
- [

  ![Kumagaya Hanyu warehouse, Saitama](https://hiterraepc.com/images/projects/2022-kumagaya-hanyu-warehouse-steelwork-completed/2022-kumagaya-hanyu-warehouse-steelwork-completed-08.webp)

  Kumagaya-Hanyu Distribution WarehouseSaitama, Japan, 2022Steel designed, made and erected in house→](https://hiterraepc.com/projects/kumagaya-hanyu-warehouse/)
- [

  ![South Commuter Railway, Philippines](https://hiterraepc.com/images/projects/north-south-commuter-railway-project-perspective/north-south-commuter-railway-project-perspective-14.webp)

  South Commuter Railway, PhilippinesSolis to Calamba, 2018 to 201956 km, 19 stations→](https://hiterraepc.com/projects/south-commuter-railway-philippines/)

![Portugal Pavilion rope envelope seen from below](https://hiterraepc.com/images/projects/2025-portugal-pavillon/2025-portugal-pavillon-11.webp)

## Insights

[All insights→](https://hiterraepc.com/insights/)

- [How a building project runs in Japan→](https://hiterraepc.com/insights/how-a-building-project-runs-in-japan/)
- [What a main contractor does on a project in Japan→](https://hiterraepc.com/insights/what-a-main-contractor-does-in-japan/)
- [Bringing a foreign design or system to a Japanese site→](https://hiterraepc.com/insights/bringing-a-foreign-design-to-a-japanese-site/)
- [Design and build, or separate design: choosing a route in Japan→](https://hiterraepc.com/insights/design-and-build-or-separate-design-in-japan/)
- [The cork had no manufacturer→](https://hiterraepc.com/insights/certifying-a-material-that-does-not-exist/)
- [Nine pavilions, one opening morning→](https://hiterraepc.com/insights/nine-pavilions-one-opening-morning/)
- [When a structure carries plant, not people→](https://hiterraepc.com/insights/when-a-structure-carries-plant-not-people/)
