Feasibility and pre-construction

Before the design is fixed: whether the site, the building and the programme work in Japan, from a company that builds here.

A feasibility study is done before the design is fixed. It answers one question: does this building work on this site, in Japan, by this date?

What a feasibility study in Japan looks at

Some of what it covers is the same anywhere: the site, the size of the building, a cost range and a programme. Other parts are specific to Japan.

  • What Japan's seismic rules mean for the structure the owner has in mind.
  • Whether the planned materials are listed types or certified in Japan.
  • The approval steps and how long they take.
  • Whether the date is realistic for the building type.

A study can also show that the project should change or not go ahead, which is worth knowing before money is committed.

What it does not cover

It is not a design, and it is not a fixed price. Where land, tax or company questions arise, the study names them for the owner's legal and tax advisers.

What the owner supplies, and when

  • At enquiry: the site or sites, what the building is for, its size and the target date.
  • At the start: any drawings, surveys or sketches that exist.

A completed study

Projectnull² Signature Pavilion, Expo 2025 Osaka
RoleFeasibility studies at concept stage, before the design was fixed

These Expo 2025 roles were held by Rebirth and Futaba Consultants, the two companies that formed Hiterra that year.

After the study

If the answer is yes, the project can move to design and build, to construction, or to project management with another builder. The owner is free to choose.

After you write

Write to enquiries@hiterraepc.com with the site and the building. Hiterra answers within two working days.